In September 2004, the Illinois Tollway approved a comprehensive plan to modernize and rebuild the 45-year old system of roadways to reduce congestion and improve service for its customers. The Congestion Relief-Program - Open Roads for a Faster Future - includes rebuilding/restoring most of the Tollway system, providing congestion relief by converting mainline toll plazas to nonstop Open Road Tolling, widening many miles of the existing roads, and extending I-355 12.5 miles south from I-55 to I-80 to accommodate the needs of growing area communities. |
|
|
|
|
|
R.M Chin & Associates, Inc. (RMCA) provides Project Management Services Systemwide. RMCA Assistant Project Managers oversee multiple renovation/widenening projects and Open Road Tolling Plaza renovations. Additionally, RMCA provides a Project Scheduler working in the Project Controls division reporting directly to Tollway Supervisors to assist in reviewing and providing schedules as required.
|
|
| Representative Project Management Assistant Projects: |
| • |
Open Road Tolling, Plazas 5, 7, 21, 51, 52, 54, 55, 66, and 69 |
 |
 |
| • |
Wadsworth Bridge reconstruction over I-294 |
 |
 |
| • |
Bridge No. 611 Replacement Northwest Tollway (I-90) |
 |
 |
| • |
I-88 Rebuild and Widen project from Washington Street to Finley Road |
 |
 |
| • |
I-355 South Extension project |
 |
 |
| • |
I-88 Rebuild and Widen project from York Road to Finley Road (approximately 9 miles) |
 |
 |
| • |
I-88 Rebuild and Widen project from Orchard Road to Plaza 61 (approximately 3.5 miles) |
|
|
Additionally, RMCA provided Environmental Inspection Project Management Assistance to the Illinois Tollway’s Environmental Program Manager and the Landscape Architect on all Tollway projects systemwide.
|
|
| Representative Environmental Inspection Projects: |
| • |
I-88 Plaza 66 (De Kalb) Open Road Tolling (ORT) project. Construction of two (2) ORT lanes in each direction. Construction of new plaza buildings. |
 |
 |
| • |
I-88 Plaza 69 (Dixon) Open Road Tolling (ORT) project. Construction of two (2) ORT lanes in each direction. Construction of new plaza buildings. |
 |
 |
| • |
I-88 Plaza 52 (Meyers Road) Open Road Tolling (ORT) project. Construction of four (4) ORT lanes in the Eastbound direction. Construction of a new plaza building. |
 |
 |
| • |
I-88 Plaza 51 (York Road) Open Road Tolling (ORT) project. Construction of three (3) ORT lanes in the westbound direction. |
 |
 |
| • |
I-88 Rebuild and Widen project from Washington Street to Finley Road (approximately 5 miles). |
 |
 |
| • |
Reconstruction and widen to four (4) lanes in each direction and construction of new Naperville Road interchange in conjunction with DuPage County. |
 |
 |
| • |
I-355 South Extension project. Construction of a 12.5-mile, three-lane extension of the North-South Tollway (I-355) from where it currently ends at the Stevenson Expressway (I-55) through Will County to I-80. |
 |
 |
| • |
I-88 Rebuild and Widen project from York Road to Finley Road (approximately 9 miles). Planning activities including design drawing and specifications review. |
 |
 |
| • |
I-88 Rebuild and Widen project from Orchard Road to Plaza 61 (approximately 3.5 miles). |
 |
 |
| • |
Includes construction of a new bridge across the Fox River. Planning activities including design drawing and specification preparation/review. |
|